Experiencia en transmisión
Transelec pone a disposición de sus clientes todos sus conocimientos y experiencia en el diseño, construcción, operación y mantenimiento de instalaciones de transmisión, para así asegurar un servicio con los más altos estándares a nivel internacional, apoyar el desarrollo de nuevas iniciativas desde su concepción y durante la operación, de manera de actuar como un socio integral para el desarrollo de negocios de transmisión.
Todo esto, amparado en la excelencia operacional, la innovación, y su capital humano y conocimiento.
02
Sistemas de transmisión
Tineo – Ancud 2x500 kV Line
Los Lagos Region
This project is essential to strengthening the national and regional electricity system, especially in the Province of Chiloé, through a 500 kV line energized at 220 kV.
The line will cross six municipalities in the Los Lagos Region’s provinces of Llanquihue and Chiloé (Llanquihue, Puerto Varas, Puerto Montt, Maullín, Calbuco, and Ancud
Approximate length of 95 km, with 251 high voltage towers.
It includes the aerial crossing of the Chacao Channel.
Double circuit in 500 kV, energized in 220 kV.
Subestación seccionadora Jadresic
Región de Antofagasta
Su construcción y operación aumenta la capacidad de transmisión de energía en el Sistema Eléctrico Nacional (SEN), lo que permitirá inyectar la enorme cantidad de energías renovables que se generan en el Norte Grande para, desde allí, transmitirlas a todo el país. Con su puesta en servicio se mejora la seguridad y continuidad del suministro eléctrico a mediano y largo plazo en la zona, de manera de dar mejor cobertura a la demanda energética de la zona para el consumo domiciliario, minero e industrial del sector.
– Patio de 500 kV en configuración de interruptor y medio.
– Patio de transformación 220/500 kV, 750 MVA, 4 unidades monofásicas.
– Patio banco de reactores monofásicos con una capacidad de 150 MVAr cada uno.
– Patio de 220 kV en configuración de interruptor y medio.
– Conexión de la línea de 1×220 kV Tap Taltal – Lalackama con la línea 1×220 kV Eólica Taltal – Tap Taltal.
– Seccionamiento de la línea de 2×500 kV Los Changos – Cumbre, propiedad de TEN.
– Seccionamiento de la línea de 1×220 kV Eólica Taltal – Tap Taltal.
– Conexión de la futura línea de 2×500 kV Jadresic – Monte Mina.
Quebrada Blanca 2 Transmission System
Tarapacá Region
A transmission project was implemented for the mining company Teck to power its new Quebrada Blanca mine, located at 4,400 masl.
The works included the construction of two new substations, expansion works, and a 122 km transmission line that includes a 1 km underground section for an operation that expects to produce 320,000 tons of copper per year in the first five years.
– 2×500 kV transmission line spanning approximately 140 km with capacity amounting to 1,500 MW between Los Changos and Kimal.
– 2 500/220 kV 750 MVA autotransformer Banks at the Nueva Crucero Encuentro Substation.
– 1 500/220 kV 750 MVA autotransformer bank at the Los Changos Substation.
– 2×220 kV transmission line spanning approximately 3 km with nominal capacity of 1,500 MW between Los Changos and Kapatur.
Pichirropulli – Tineo 2x500 kV Line
Pichirropulli – Tineo 2×500 kV Line
This line reinforced the transmission system in southern Chile, increasing the transmission capacity to inject future energy sources, such as renewables, into the central area.
The line runs west of the Route 5 South Highway, and 60% of it does so alongside an existing Transelec line, avoiding visually impacting a new area.
Approximately 145 km in length, with 365 high-voltage towers.
Double circuit in 500 kV, energized in 220 kV.
4 AAC Verbena type conductors per phase, with a capacity of 1500 MVA per circuit at 35ºC with sun.
Frutillar Norte Substation
Los Lagos Region
Its commissioning increased the electricity supply security in the country’s south and met the area’s energy demand. In addition, it is a connection point for generation projects in southern Chile.
Innovative construction methods were used to reduce the socio-environmental impact. Helical anchors and piles were used for the foundations of the substation and the structures of the sectioning lines, which avoided making large excavations and reduced concrete use.
220 kV Main Yard.
Sectioning of the 2×220 Rahue – Puerto Montt high voltage line.
Changos – Kapatur and Changos – Kimal lines
Mejillones, Antofagasta Region
Its construction made it possible to interconnect the SING and SIC systems and increased transport capacity between the Crucero—Encuentro node and the National Interconnected System.
2×500 kV line, approximately 140 km long, with 1,500 MW capacity, between Los Chagos and Kimal.
Two banks of 500/220 kV 750 MVA auto-transformers at the Nueva Crucero Encuentro Substation.
One bank of 500/220 kV 750 MVA auto-transformers at Los Changos Substation.
2×220 kV line, approximately 3 km long with a nominal capacity of 1,500 MW, between Los Changos and Kapatur.
New Lo Aguirre – Cerro Navia Line
Metropolitan Region, western sector
The construction of this line increased the electricity transfer capacity from the 500 kV system of the Lo Aguirre substation to 220 kV at the Cerro Navia substation, thus providing greater security and capacity.
2×220 kV line between the Lo Aguirre and Cerro Navia substations. Nominal capacity of 1,500 MVA.
Approximately 12 km long, with an underground tunnel section of around 1.5 km.
The project includes the distribution yards at Lo Aguirre and Cerro Navia.
Entre Rios Substation
Cabrero, Biobío Region
The project includes the construction of the Entre Ríos substation (originally called Nueva Charrúa), the new 2×220 kV Entre Ríos – Charrúa line, and the sectioning of the 2×500 kV Charrúa – Ancoa 1 and 2 lines.
The infrastructure will be a new 500 kV injection point for connecting future electricity generation sources and controlling the increase in short circuit levels in the existing Charrúa substation.
New substation with 500 kV and 220 kV yards.
500 kV yard in a breaker-and-a-half arrangement with space for installing 8 diagonals and 220 kV yard in a breaker-and-a-half arrangement with space for installing 9 diagonals.
Three banks of 500/220 kV auto-transformers with their respective reserves.
500 kV, 220 kV, and tertiary auxiliary bar.
New 500/220 kV 750 MVA auto-transformer, with tertiary bar, reserve unit, auxiliary bars, disconnectors, and the respective 500 kV and 220 kV diagonals.
New 2×220 kV line between the Nueva Charrúa and Charrúa substations, with a minimum capacity of 1,000 MVA per circuit at room temperature of 35ºC and two 220 kV distribution yards connected to two different bar sections in Charrúa.
03
Sistemas de suministro de agua
Construcción, diseño e instalación de plantas desalinizadoras y sistemas de transporte de agua de mar para clientes mineros, permitiendo que sus operaciones reduzcan el uso de aguas continentales.
Aguas Horizonte
Desalinizadora para Codelco
En un modelo denominado BOOT (Build, Own, Operate and Transfer), Aguas Horizonte SpA, empresa fundada por Marubeni y Transelec, financiará, construirá, será propietario y operará por 20 años el proyecto, para luego, transferirlo a Codelco al final del contrato.
El proyecto abastecerá de agua a las operaciones Chuquicamata, Radomiro Tomic y Ministro Hales de Codelco. Las obras incluyen la planta de desalación de ósmosis inversa, obras marítimas y un sistema de impulsión de agua que recorrerá más de 160 kilómetros con tuberías, para entregar el agua en un reservorio, que se construirá en Radomiro Tomic a más de 3.000 metros de altura.
Aguas Esperanza
Agua de mar para Antofagasta Minerals
A través de un consorcio conformado por Transelec y Almar Water Solutions, Aguas Esperanza SpA está desarrollando un sistema de transporte de agua sin desalar para la expansión de minera Centinela, de Antofagasta Minerals.
El proyecto incluye la adquisición y operación de una tubería de agua de 144 km de longitud que transporta 1.194 lps (110.678 m3/día), suministrando agua de mar a 60 km al norte del sitio minero en Michilla, donde se encuentra el puerto de Centinela. Además, contempla la construcción y operación de una nueva tubería de 144 km de longitud y 650 lps (56.333 m3/día) paralela a la tubería existente.
04
Sistemas de almacenamiento
La empresa pone su experiencia y equipos calificados para desarrollar esta infraestructura clave para habilitar la conexión de energías renovables y darle estabilidad a clientes y usuarios finales.
Proyecto BESS
Almacenamiento para Granja Solar
Copec y Transelec están desarrollando un sistema de almacenamiento de energía con baterías (BESS) a gran escala en el parque fotovoltaico “Granja Solar”, ubicado en la Región de Tarapacá. Este sistema permitirá almacenar e inyectar al Sistema Eléctrico Nacional (SEN) cada año energía equivalente al consumo eléctrico de más de 60 mil hogares.
El sistema, que será construido, gestionado y operado por Transelec, tiene una potencia nominal de inyección de 105 MW y una capacidad de almacenamiento de 420 MWh, lo que permitirá dar respuesta a la alta tasa de vertimiento de energía renovable.