By means of the Connection Conditions document, general conditions will be set forth which will be taken into consideration by all those who may be interested in connecting to Transelec’s Transmission System in the Central Interconnected System (SIC) or the Northern Interconnected System (SING), whenever the installations to be connected are intended to draw power and energy from such systems. This conditions are of legal, commercial and technical nature, and are applied accordingly both before the connection of the installations and during their operation.